IEC 61724 Engine
Plant Scope: Granularity:
Standard CUF Formula: Gen / (Cap × Hrs) × 100
Cumulative Energy
1,795.8k MWh
+2.4% vs Contracted P50 Target
Average CUF %
22.8%
Standard Utility Benchmark
Mean Performance Ratio
81.5%
High Quality IEC 61724 Class A
Total Period Revenue
₹58.42 Cr
CO₂ Avoided: 1.47M Tonnes
Actual vs Contracted Target Energy (MWh)
Variance analysis against guaranteed generation thresholds
Efficiency Index (PR % & CUF %)
Technical performance ratio and capacity factor curves
Underlying Analytics Breakdown Table
Empirical dataset used to generate the visualizations above

Mathematical Formulation & IEC 61724 Engineering Standards Reference

Capacity Utilization Factor (CUF):
CUF (%) = (E_actual / (P_nominal × T_hours)) × 100
Measures actual electrical energy extracted relative to continuous maximum nameplate rating over period hours.
Performance Ratio (PR):
PR (%) = (Y_final / Y_reference) × 100
Quantifies overall system derating losses (inverter clipping, thermal heating, dust soiling, cable I²R dissipation).
Commercial Tariff Revenue:
Revenue (INR) = Generation (kWh) × PPA Tariff Rate (INR/kWh)
Computed across Power Purchase Agreements ranging between ₹2.85 to ₹3.65 / kWh.
Grid Decarbonization Offset:
CO₂ Avoidance = Generation (MWh) × 0.82 Tonnes/MWh